John Braun’s Real Estate Company Operated A Sand Mine In Chehalis That Damaged The Local Environment And Failed To Meet Required Environmental Protection Standards
Braun Was The Registered Agent Of Raindrop Properties LLC
December 2006: John E. Braun, John R. Braun, And James R. Braun Filed Paperwork To Create Raindrop Properties LLC With John E. Braun Listed As The Registered Agent. [Washington Secretary of State, Certificate of Formation Doc No 972352-001, 12/26/06]
2016-2025: Raindrop Properties Operated A 56-Acre Sand Mine In Chehalis
December 2016: Raindrop Properties Filed For A Conditional Use Permit To Operate A 56-Acre Site As A Mine For The Purpose Of Selling The Onsite Soil To Fill Projects Within Lewis County. “This is another ‘other agency SEPA review’ from the City of Chehalis (MSC16-0132) for a Conditional Use Permit to operate 56 acre site as a mine for the purpose of selling the onsite soil to fill projects within the Lewis County area. The mine operation will include moving up to 980,000 cubic yards of material over the projected 10 year lifespan of the surface mine. [...] It is located entirely within the city limits of Chehalis at 2241 NE Kresky Ave and is owned by Raindrop Properties, LLC.” [Lewis County Community Development, 12/27/16]
May 2025: Braun Filed An Operating Status Change Form Listing That Kresky Sand Mine Would Become Active On May 12, 2025. According to the State of Washington Department of Ecology, John Braun, who listed himself as the manager, filed an Operating Status Change Form for a sand and gravel general permit stating that the Kresky Sand Mine would become active on 5/12/25. The site was under permit for Raindrop Properties LLC under permit #WAG501590. Braun listed that the site would be active more than 90 days per year and involved in mining/extraction/blasting. [State of Washington Department of Ecology, Permit#WAG501598 Operating Status Change Form, 5/6/25]
- On The Application For Kresky Sand Mine, Braun Said The Site Would Participate In Mining Activities More Than 90 Days Per Year. According to the State of Washington Department of Ecology, John Braun, who listed himself as the manager, filed an Operating Status Change Form for a sand and gravel general permit stating that the Kresky Sand Mine would become active on 5/12/25. The site was under permit for Raindrop Properties LLC under permit #WAG501590. Braun listed that the site would be active more than 90 days per year and involved in mining/extraction/blasting. [State of Washington Department of Ecology, Permit#WAG501598 Operating Status Change Form, 5/6/25]
The Kresky Sand Mine Planned To Remove 37 Acres Of Trees
2016: The Environmental Impact Statement For The Kresky Sand Mine Said The Mine’s Operations Would Remove “Approximately 37 Acres Of Vegetation” Including Trees. “Approximately 37 acres of vegetation will be removed to fully mine this two-phase project. Vegetation removal includes mainly deciduous and coniferous trees in the forested area and grass in the cleared areas.” [City of Chehalis Community Development Department, File# SEPA-16-0010, 12/27/16]
- Initial Plans For The Kresky Sand Mine Planned To Move 980,000 Cubic Yards Of Material Over A 10 Year Lifespan. “This is another ‘other agency SEPA review’ from the City of Chehalis (MSC16-0132) for a Conditional Use Permit to operate 56 acre site as a mine for the purpose of selling the onsite soil to fill projects within the Lewis County area. The mine operation will include moving up to 980,000 cubic yards of material over the projected 10 year lifespan of the surface mine. [...] It is located entirely within the city limits of Chehalis at 2241 NE Kresky Ave and is owned by Raindrop Properties, LLC.” [Lewis County Community Development, 12/27/16]
January 2024: The Washington Department Of Ecology Investigated The Kresky Sand Mine After A Citizen Complaint And Found Destabilized Soil, Sediment Discharges Into Nearby Wetlands, And The Site Operating Without The Proper Permit
January 2024: The Washington Department Of Ecology Investigated A Citizen Complaint That The Sand Mine Was “Discharging A Lot Of Soil And Stormwater Into The Wetland On The West Side Of Kresky Avenue And Eroded Soil Is At Times Present On The Shoulder Of Kresky Avenue.” “The Department of Ecology (Ecology) conducted an initial complaint-driven Compliance Inspection of former Kresky Site Development (Construction Stormwater General Permit (CSWGP) WAR305056), current Kresky Sand Mine (Facility) on January 30, 2024. The Washington State Department of Natural Resources (DNR) Surface Mining Program forwarded a citizen complaint to Ecology that stated: ‘the site is discharging a lot of soil and stormwater into the wetland on the west side of Kresky Avenue and eroded soil is at times present on the shoulder of Kresky Avenue.’” [State of Washington Department of Ecology, Kresky Sand Mine – Sand & Gravel General Permit No. WAG501598 Compliance Inspection, 5/13/24]
- January 30, 2024: At A Site Visit, The Washington Department Of Ecology Found “No Soil Stabilization Best Management Practices” At The Kresky Sand Mine. “At the end of 2023, at the request of the City of Chehalis, Raindrop began preparation work to install a new concrete sidewalk parallel to Kresky Avenue on the frontage property of the Facility’s eastern parcels (021636001000, 021636001003, 021645002002, and 021650002003). However, due to winter weather conditions, the concrete would not be poured until March 2024 (Photographs 4 and 5). Though the soil disturbance work had been dormant for nearly two months, no soil stabilization Best Management Practices (BMPs) were observed on January 30, 2024 (Photographs 1 and 2).” [State of Washington Department of Ecology, Kresky Sand Mine – Sand & Gravel General Permit No. WAG501598 Compliance Inspection, 5/13/24]
- May 2024: The Washington Department Of Ecology Found The Kresky Sand Mine Did Not Have The Proper Permits And Needed A Sand & Gravel General Permit. “Though this Facility had CSWGP coverage with Ecology, Raindrop Properties, LLC (Raindrop) also had DNR Surface Mining Reclamation Permit (#13248) coverage. A mining operation in Washington State with DNR Surface Mining Reclamation Permit coverage typically also has Ecology’s Sand & Gravel General Permit (SGGP) coverage, and not CSWGP coverage. Ecology’s SGGP Manager, Jessica McConnell, and Ecology’s CSWGP Inspector, Jacob Neuharth, both responded on January 30, 2024. [...] Because this site conducts activities associated with North American Industrial Classification System (NAICS) Code 212321 Construction Sand and Gravel Mining and has DNR Surface Mining Reclamation Permit coverage, it was determined that Raindrop would need to apply for SGGP coverage with Ecology and terminate coverage under the CSWGP (Table 1 of the SGGP).” [State of Washington Department of Ecology, Kresky Sand Mine – Sand & Gravel General Permit No. WAG501598 Compliance Inspection, 5/13/24]
March-April 2024: The Washington Department Of Ecology’s Inspections Showed Raindrop Properties Failed To Stabilize Land Along The Kresky Sand Mine And Prevent Erosion
March 5, 2024: The Quinault Indian Nation Submitted A Complaint The Kresky Sand Mine Was Not Contained And “Erosion Control BMP’s Did Not Appear To Be Maintained.” “On March 5, 2024, Ecology received an Environmental Report Tracking System (ERTS) complaint (#729263) from the Quinault Indian Nation (Quinault) stating: ‘Exposed soils on steep slopes, evidence of riling with potential for erosion. Site not contained and erosion Control BMP’s did not appear to be maintained. Evidence of sedimentation in potential wetland just West of NE Kresky Ave.’ Ecology contacted the Quinault representative to address their concerns and let them know that Ecology would follow-up with stabilization progress at the Facility.” [State of Washington Department of Ecology, Kresky Sand Mine – Sand & Gravel General Permit No. WAG501598 Compliance Inspection, 5/13/24]
- March 6, 2024: On A Site Visit, The Washington Department Of Ecology Found The Land Along Kresky Avenue Was Not Been Stabilized And Advised Raindrop Properties To Address The Situation As Quickly As Possible. “Ecology returned to the Facility on March 6, 2024, to conduct a follow-up site visit. Though no water quality violations were observed, the disturbed land along Kresky Avenue still had not been stabilized but the concrete sidewalks had finally been poured (Photographs 4 and 5). Raindrop’s onsite representative stated that they were waiting for drier weather to grade and hydroseed and planned to complete this following the next continuous span of 4 to 5 dry days. Ecology and Raindrop walked the frontage along Kresky Avenue and inspected the stormwater structures on the east side (Photographs 6 and 7), as well as the stormwater pond on the west side of Kresky Avenue (Photograph 8), and the delineated wetlands in the southeast corner of parcel 021652007000 (Photographs 9 and 10). Ecology again asked Raindrop to grade and hydroseed the exposed soil along Kresky Avenue as soon as possible.” [State of Washington Department of Ecology, Kresky Sand Mine – Sand & Gravel General Permit No. WAG501598 Compliance Inspection, 5/13/24]
- April 5, 2024: A Final Visit From Washington Department Of Ecology Found Raindrop Properties Had Finally Taken Steps To Stabilize The Disturbed Land At The Kresky Sand Mine. “Ecology returned to the
Facility on April 5, 2024, to follow-up on stabilization activities. As evidenced in Photographs 11 – 13, all the grading and most of the hydroseeding along Raindrop’s Kresky Avenue frontage was completed. What was not hydroseeded, sits below the grade of the curb, preventing discharge to Kresky Avenue. Raindrop plans to hydroseed the remaining portions of the frontage when additional utility work associated with the new concrete is completed in May 2024.” [State of Washington Department of Ecology, Kresky Sand Mine – Sand & Gravel General Permit No. WAG501598 Compliance Inspection, 5/13/24]
2024: The Washington Department Of Ecology Identified Multiple Compliance Issues At The Kresky Sand Mine, Including Missed Sampling Requirements
August 28, 2024: The Washington Department Of Ecology Inspection Found Issues At The Kresky Sand Mine Requiring Correction: Lacking An Additional Spill Kit And Track-Out Into The Main Road. “The Department of Ecology (Ecology) conducted a compliance inspection of the Kresky Sand Mine (Facility) on August 28, 2024. [...] FINDINGS • At least one additional spill kit should be located in the chemical storage and vehicle maintenance tent area. • Minor track-out was observed leading to NE Kresky Avenue.” [State of Washington Department of Ecology, Kresky Sand Mine – Sand & Gravel General Permit No. WAG501598 Compliance Inspection, 9/16/24]
April-May 2024: The Washington Department Of Ecology Sent The Kresky Sand Mine A Violation For Not Meeting The Sampling Frequency For Turbidity In Both April And May 2024. “This email is in reference to the Second Quarter DMRs for WAG501598. Thank you for your compliance with submitting DMRs for this site. The DMR triggered violations indicating that you did not meet the sampling frequency the turbidity parameter for monitoring points M1 and S001. The reason that this occurred is because there is only 1 entry for April and May for the turbidity parameter for M1 and S001. (See DMR entry below.) The permit requires that 2/monthly turbidity samples are collected and 2 entries are provided for each month, even if there is No Discharge for the entire month. Since only 1 entry was provided for April and May, a violation was triggered.” [State of Washington Department of Ecology, WAG501598 Kresky Sand Mine -Data input requirements for reporting Turbidity on DMRs, 7/30/24]